Socrata

Close
Author
carandia
Description
This data set has been pre-filtered from the full project data set to contain project level information only
Category
Permitting Project
Rating
Current value: 0 out of 5
Data Provided By
Permitting Data Portal
Source Link
https://www.permits.performance.gov/
License
Public Domain
This view cannot be displayed
This view is currently private. You can preview it, but you will need to make it public before people will be able to see it.
Size
  • 500x425

  • 760x646

  • 950x808

Custom Size

425x425 is the minimum size

The Socrata Open Data API (SODA) provides programmatic access to this dataset including the ability to filter, query, and aggregate data. For more more information, view the API docs for this dataset or visit our developer portal

API Endpoint:

Field Names:

Project
project_title
Project Lead Agency
project_field_project_lead_agency
Project Lead Agency Bureau
project_field_project_lead_agency_bureau
Project Status
project_field_project_status
Project Sector
project_sector
Project Sector Type
project_sector_type
Project Location Full Address
project_field_location_other
Project Location State
project_field_location_state
Project Location Street Address
project_location_street_address
Project Location City
project_field_location_city
Project Location County
project_field_location_county
Project Location Zipcode
project_field_location_zipcode
Project Location Latlong
project_latlong

Use OData to open the dataset in tools like Excel or Tableau. This provides a direct connection to the data that can be refreshed on-demand within the connected application.

Socrata OData documentation

Tableau users should select the OData v2 endpoint option.

OData V4 Endpoint:

OData V2 Endpoint:

You are viewing a mobile version of this dataset. To access the full dataset, tap here.